Reception Refurbishment, Manchester

Studio 4 were asked to design a new reception area within an existing office building as part of a larger commercial refurbishment project in Manchester. This first stage of the project was completed in Summer 2018. The design approach included references to the existing building’s post-modern design ethos. The scope of work included the refurbishment of the existing main reception area and waiting area. We look forward to progressing stage two of this project in the Summer 2019.

Back