The scheme followed on from Studio 4’s design of their London Headquarters. The successful joinery, furnishings and finishes from the London project were developed for the larger, open plan arrangement for the Cork Technical support centre. The brief included open plan areas for up to 90 people and a suite of meeting rooms, conference room and a large training room.
The Centre has been designed to provide a space, which takes advantage of as much natural daylight as possible whilst maintaining a high level of privacy and visual amenity by the inclusion of a courtyard garden, solely accessed via the Information Centre.
STUDIO 4 were appointed by a fast expanding US technology company to locate and fit out their London based UK sales office. This fast-track project required a detailed evaluation of a number of available category A office spaces in central London.
Chelsea & Westminster Hospital
NHS Foundation Trust
Chelsea and Westminster Hospital NHS Foundation Trust had a pressing need to expand its clinical services. The new office space was achieved by decanting administrative and clerical support services previously embedded in its clinical space.
Islington Primary Care NHS Trust / St Luke's Hospital
Short-listed for the 2011 Building Better Healthcare's Best Mental Health Design, this 10-bed inpatient unit for Level 3 adolescent mental health services is situated Muswell Hill, north London.
Chelsea & Westminster Hospital NHS Foundation Trust
The relocation of three existing Adult Outpatient facilities to unite as one department within the Lower Ground Floor of Chelsea and Westminster Hospital.
Chelsea & Westminster Hospital
NHS Foundation Trust
Chelsea and Westminster Hospital required additional facilities for Children's Services to allow for the expansion of Neonatal and Paediatric Surgery and to provide a new 12 bed Pediatric High Dependency Unit.
Chelsea & Westminster Hospital
NHS Foundation Trust
Located in the heart of SOHO, this new HIV & GUM clinic for Chelsea and Westminster NHS Foundation Trust is already regarded as a model for future clinics.
Chelsea & Westminster Hospital
NHS Foundation Trust
Chelsea and Westminster Hospital required new facilities for the Hospital Radio which would give the service a more prominent position within the main atrium space of the building.
The Margarete Centre brought various Drug Service providers together onto one site in order to provide high quality facilities for both staff and patients.
The Victorian facilities for doctors on call at St Mary's Hospital were upgraded to bring them in line with regulations and to make them more habitable and hospitable.
Master planning is a key component of the work carried out by STUDIO 4. This work ranges from compiling detailed Estate Control Plans, identifying key issues with current infrastructure, to Development Control Plans for future reorganisation of a hospital campus.